SL.
NAME OF COMPANY
Country OF Organization
Working Period
SCOPE OF WORK
PROJECTS NAME
01M/s. Bollore Logistics Bangladesh Bangladesh
2020
Customs Clearing and Transportation of  Project Cargo ODC including General Cargo + Container from Mongla Sea Port, to  Mongla By RoadLAUGFS Gas (Bangladesh) Ltd., Mongla
02M/s. Sembcorp North-West Power Company Ltd. Singapore2020Customs Clearing and Transportation of  Power Project General Cargo from  Dhaka Airport to  Sirajgonj By Road413.792MW (GAS)/ 333.02MW (Fuel Oil) Duel Fuel Fired Power Generation Facility, Sirajgonj
03M/s. Ganapati Industrial Pvt. Ltd.
India
2019-2020
Customs Clearing and Transportation of  Power Project Cargo General Cargo from Benapole Land Port to  Khulna & Mongla By RoadConstruction of Khulna-Mongla Rail Project
04M/s. IRCON International Ltd.India
2019-2020
Customs Clearing and Transportation of  Power Project Cargo General Cargo from Benapole Land Port to  Khulna & Mongla By Road
Construction of Khulna-Mongla Rail Project
05M/s. Bhairob Power LimitedBangladesh
2019
Customs Clearing and Transportation of Power Project Cargo H/L  & ODC including General Cargo from Mongla Sea Port & Chittagong Sea Port to Bhairob By Road & River
54.50MW  HFO Fired Power Project, Bhairob
06M/s. Manikganj Power Generation Ltd. 
Bangladesh
2019Customs Clearing and Transportation of Power Project Cargo H/L (Each 320 Tons)   & ODC including General Cargo from Mongla Sea Port & Chittagong Sea Port to Manikganj by Road & River
162MW  HFO Manikganj Power Generation Ltd, Manikganj
07M/s. Sinotrans Bangladesh Ltd.
China2019Customs Clearing and Transportation of  Power Project General Cargo from Sirajgonj to Mongla Sea Port, By Road Sirajgonj 225MW Combined cycle Power Plant (Duel Fuel 3rd Unit) Project, Sirajgonj
08
M/s. Orion  Power Rupsha Ltd.
Bangladesh
2019
Customs Clearing and Transportation of  Power Project Cargo H/L  & ODC including General Cargo from Mongla Sea Port to Khulna
IPP 105MW Power Plant, Khulna
09M/s. TIE JUN International (BD) Ltd. 
China
2019
Customs Clearing and Transportation of Power Project Cargo H/L  & ODC including General Cargo from Chittagong Sea Port, Mongla Sea Port & Dhaka Airport to Sirajgonj
A 413.792MW (GAS)/333.02 MW (Fuel Oil) Duel-Fuel fired generation facility, Sirajgonj,
10
M/s. IPL International (BD) Pvt. LTd.
China
2018-2019
Customs Clearing and Transportation of Power Project Cargo H/L  & ODC including General Cargo Gazipur from Mongla Sea Port & Chittagong Sea Port to Gazipur
100(+ 10%)MW HFO Fired Power PI, Kodda, Gazipur
11
M/s. Hyosung Corporation
South Korea
2018-2019
Customs Clearing and Transportation by road & river of Power Project Cargo H/L  & ODC including General Cargo from  Chittagong Sea Port
1)       132/33/11KV Grid Substation, Tongi, Gazipur
2)       132/33/11KV Grid Substation, Uttara, Dhaka
3)       132/33/11KV Grid Substation, Purbachal, Dhaka
4)       132/33/11KV Grid Substation, Aftabnagar, Dhaka
5)       132/33/11KV Grid Substation, Banani, Dhaka
12
M/s. Siemens Bangladesh Ltd.
Bangladesh
2017-2018
Customs Clearing and Transportation By Road & River of  Power Project Cargo H/L  & ODC including General Cargo from Chittagong Sea Port, Benapole Land Port & Dhaka Airport
1)       230/132KV GIS Sub-Station, Shyampur, Dhaka
2)       132/33KV GIS Sub-Station, Dhamrai, Dhaka
13
M/s. Desh Energy Ltd.
Bangladesh
2017-2018
Customs Clearing and Transportation of Power Project Cargo H/L  & ODC including General Cargo  Power Project Materials including H/L from Mongla Sea Port to Chandpur
200MW Desh Energy Chandpur Power Company Ltd.  Natun Bazar, Chandpur
14
M/s. Confidence Power Bogra Unit-2 Limited
Bangladesh
2017-2018
Customs Clearing and Transportation of Power Project Cargo H/L  & ODC including General Cargo  Power Project Materials including H/L from Mongla Sea Port to Bogra
113 MW Confidence Power Bogra Unit-2, Bogura
15
M/s. United Mymensingh Power Limited
Bangladesh
2017-2018
Customs Clearing and Transportation of Power Project Cargo H/L  & ODC including General Cargo  Power Project Materials including H/L from Mongla Sea Port to Mymensing 
200MW (HFO) Fired Power Plant of Unted Mymensing Power Ltd., Mymensing
16
M/s. RESOC Shipping Pvt. Ltd.  
China
2017
Customs Clearing and Transportation of Power Project Cargo H/L  & ODC including General Cargo  Power Project Materials including H/L from Chittagong Sea Port to Bashkhali, Chittagong 
SS Power-1,612MW Coal fired Power Plant, Bashkhali, Chittagong
17M/s. Banco Energy Generation Ltd.
Bangladesh
2016-2017
Customs Clearing and Transportation of Power Project Cargo H/L  & ODC including General Cargo from Chittagong Sea Port , Mongla Sea Port to  Narayangonj
53.972MW HFO Fired Power Project, Meghna Ghat, Narayangonj
18
M/s. Siemens Bangladesh Ltd.
Bangladesh
2016-2017
Customs Clearing and Transportation of Power Project Cargo H/L  & ODC including General Cargo Power Project Materials from Chittagong Sea Port, Benapole Land Port & Dhaka Airport to Keranigonj, Dhaka
230/132/33KV GIS Sub-Station, Keranigonj, Dhaka
19
M/s. China Northeast Electric Power Engineering & Services Co. Ltd. (NEPC)
Bangladesh
2016
Customs Clearing and Transportation of Power Project Cargo H/L  & ODC including General Cargo from Chittagong Sea Port & Dhaka Airport to Sylhet
341 MW  Gas Fired  Combined Cycle Power Plant (Summit Bibiyana II), Habigonj, Sylhet
20
M/s. Hyosung Corporation
Bangladesh
2016
Customs Clearing and Transportation of Power Project Cargo H/L  & ODC including General Cargo from Chittagong Sea Port & Dhaka Airport to Sylhet
400/230 KV Air Insulated switchgear (AIS) sub-station at Bibiyana, Habigonj, Sylhet
21
M/s. Neptune Commercial Ltd.
Dhaka
2014
Transportation of 2 Pkgs. Gas Turbine and Alternator bearing weight 69 Tons and 40 Tons respectively onto 8(Eight) Meter height foundaton at 200 MW United Ashugonj Energy Limited
200 MW United Ashugonj Energy Limited, Ashugonj
22
M/s. Rajlanka Powe Conpay Linited
Sri Lanka
2013-2014
Customs Clearing and Transportation of  Power Project Materials including H/L, Container from Mongla Sea Port & Chittagong Sea Port to Natore by Road & River for 50MW HFO Fired Power Project
Rajlanka Power Company Limited, Natore
23
M/s. China National Machinery Import & Export Corporation
China
2012-2013
Customs Clearing and Transportation of  Power Project Materials (ODC/OWC) including H/L from Mongla Sea Port & Chittagong Sea Port to Sirajgonj by Road & River for 150MW Packing Power Plant to 225MW Combined Cycle Power Pland Project
150MW Packing Power Plant to 225MW Combined Cycle Power Pland Project, Sirajgonj
24
M/s. Taenchless Engineering Services (P) Ltd.
India
2012-2013
Customs Clearing and Transportation of  HDD Rig Machine  & Rig Equipments (150 Tons Pulling Capacity) including various types of Pipes & other General Cargo from Chittagong Sea Port & Benapole Land Port to various sites of Bheramara-Khulna Gas Pipeline Project
Bheramara-Khulna Gas Pipeline Project, Bheramara
25
M/s. Fernas Insaat A.S. Construction Co. Inc
Turkey & India
2012-2013
Customs Clearing and Transportation of  H/L, HDD Rig Machine  & Rig Equipments (250 Tons Pulling Capacity) including various types of Pipes & other General Cargo from Chittagong Sea Port & Benapole Land Port to various sites of Bakhrabad-Siddirgonj Gas Transmission Pipeline Project
Siddirgonj Gas Transmission Pipeline Project, Siddirgonj
26M/s. China Hellongjang International Economic & Technical Cooperative Co.
China
2011-2012
Customs Clearing and Transportation of  H/L, (ODD/HDD) & other General Cargo from Chittagong Sea Port to Rawjan & Roniniganj for the Building Construction Project
1)       Sino-Bangladesh Frienship Rawjan Station Govt. Primary School.
2)       Sino-Bangladesh Frienship Rominiganj Govt. Primary School
27
M/s. Trenchless Engineering Services (P) Ltd.
China
2012
Customs Clearing and Transportation of  H/L (1 Unit=100MT) & other General Cargo from Chittagong Sea Port to various sites of Bheramara-Khulna Gas Pipeline Project
Bheramara-Khulna Gas Pipeline Project, Bheramara
28
M/s. DrillTec-Maxwell JV
Dhaka
2011-2012
Custom Clearance & Inland Transportation of 23 X 40' Containers (STC 1 Unit of 350 M. Tons Capacity Rig & its Accessories= 651.789 MT) from Chittagong Sea Port to Ishardi Site for Jamuna Bridge - Bheramara Gas Teansmission Pipeline Project
Jamuna Bridge - Bheramara Gas Teansmission Pipeline Project, Ishardi
29
M/s. GS Engineering & Construction
South Korea
2011-2012
Customs Clearing & Transportation by Road & River of H/L (Each 121.30MTof 225/300MVA Transformer) including General Cargo from Chittagontg Sea Port to Substation site at Sidderganj
230 KVA at Siddirgan, Narayangonj
30
M/s. Orion Group, Dhaka
Bangladesh
2010-2011
Customs Clearing, Heavy Jetty Construction and Transportation of  Power Project Cargo H/L (Each 130 MT), ODC including General Cargo from Mongla Sea Port & Chittagong Sea Port to Narayangonj by Road & River for 100MW Rental Power Plants installation Project
IEL Consortium & Associates Ltd. Meghnaghat, Naryangonj
31
M/s. Orion Group, Dhaka
Bangladesh
2010-2011
Customs Clearing, Heavy Jetty Construction and Transportation of  Power Project Cargo H/L (Each 130 MT), ODC including General Cargo from Mongla Sea Port & Chittagong Sea Port to Narayangonj by Road & River for 100MW Rental Power Plants installation Project
Dutch Bangla Power & Associates Ltd., Siddhirgonj, Narayangonj
32
M/s. LTL Global Engineering Services (Pvt) Ltd.
Sri Lanka
2010-2011
Logistics Support (Mobile Crane, Crawler Cranes Boom Trucks and Pick and Carry Cranes at Narayangonj
IEL Consortium & Associates Ltd. Meghnaghat, Naryangonj
33
M/s. LTL Global Engineering Services (Pvt) Ltd.
Sri Lanka
2010-2011
Logistics Support (Mobile Crane, Crawler Cranes Boom Trucks and Pick and Carry Cranes at Narayangonj
Dutch Bangla Power & Associates Ltd., Siddhirgonj, Narayangonj
34
M/s. Hyosung Corporation
South Korea
2010
Customs Clearing,  and Transportation of  Power Project Cargo H/L (Each 120MT Maximum), ODC including General Cargo from Chittagong Sea Port to Hathazari by Road
Hathazari Sub Station, Chittagong
35
M/s. Hyosung Corporation
South Korea
2010
Customs Clearing,  and Transportation of  Power Project Cargo H/L (Each 120MT Maximum), ODC including General Cargo from Chittagong Sea Port to Comilla by Road & River
Comilla Sub Station, Comilla 
36
M/s. Maxwell Enginnering Works Ltd.
Bangladesh
2007
Customs Clearing and Transportation of  H/L, Equipment including various types of Pipes & other General Cargo from Chittagong Sea Port to Sylhet of Jalalabad Gas Pipe Line Project 
Jalalabad Gas Pipe Line Project, Sylhet
37
M/s. Power Grid Company of Bangladesh Ltd.
Bangladesh
2004-2007
Customs Clearing and Transportation of H/L including General Cargo (6,500MT)  Under Contact No. PGCB/NDF/1 Dt. 20.12.2004
PGCB
38M/s. Korea South-South Cooperation Corporation (NAMNAM)
South Korea
2006
Customs Clearing, Heavy Jetty Construction and Transportation of  Project Cargo H/L (ODC), Equipment and Materials from Mongla Sea Port & Chittagong Sea Port to Bogra by Road & River
Maddhapara Hardrock Mining Project, Bogra
39M/s. Union Mercantile Limited
Bangladesh
2006
Customs Clearing and Transportation of  Power Project Cargo H/L (Each 49MT), ODC including General Cargo from Mongla Sea Port to Khulna by Road & River for 230KV Khulna South Substation Project (PGCB)
230KV Khulna South Substation Project (PGCB), Khulna
40
M/s. Mir Akhter Hossain Ltd., Dhaka
Bangladesh
 
Customs Clearing and Transportation of Machinery Cargo from Benapole Land Port to Dhaka
General Importer (Builders)
41
M/s. Hyosung Corporation
South Korea
2004-2005
Customs Clearing and Transportation of  Power Project Cargo H/L (Each 62 MT), ODC including General Cargo from Chittagong Sea Port to Aminbazar, Savar by Road & River
230/132KV Aminbazar Substation, Savar
42
M/s. Siemens Bangladesh Ltd.
South Korea
2003
Customs Clearing and Transportation of  Project Cargo H/L (Each 48MT), ODC including General Cargo from Chittagong Sea Port to Kushtia by Road & River for Ganga Kapatakha Sub-Station Project(G.K. Project)
Ganga Kapatakha Sub-Station Project(G.K. Project) of Bangladesh Water Development Board, Bheramara, Kushti
43M/s. Siemens Bangladesh Ltd.
South Korea
2003
Customs Clearing and Transportation of Power Project Cargo H/L (Each 40MT), ODC including General Cargo from Mongla Sea Port to Jessore, Jhenidah & Kushtia by Road
Bangladesh Power Development Board, Jessore, Jhenidah & Kushtia
44M/s. China Harbour Engineering Company
China
2002-2003
Customs Clearing and Transportation of Project Cargo H/L, ODC including General Cargo from Mongla Sea Port, Chittagong Sea Port & Dhaka Airport to Sikerpur, Barishal by Road & River
SD Bridge Project Sikerpur, Barishal
45
M/s. Siemens Bangladesh Ltd.
South Korea
1996-97
Customs Clearing and Transportation of Power Project Cargo H/L (Each 44MT), ODC including General Cargo from Mongla Sea Port, Chittagong Sea Port, Benapole Land Port & Dhaka Airport to Dinajpur by Road & River
Maddhapara Hardrock Mining Project, 33.6.6KV Sub Station, Dinajpur, Rangpur 
46
M/s. GEODIS Calberson Europe IDE., Paris
France
2002
Customs Clearing and Transportation of Project Cargo H/L (Each 44MT), ODC including General Cargo from Chittagong Sea Port to Dhaka Cantonment  by Road
United Nation, NY, Dhaka
47
M/s. Bangladesh Chemical Industrial Corporation
Bangladesh
1999-2000
Customs Clearing & Transportation of Urea Fertilizer 41,035 Tons from Chittagong Sea Port to Diferent Buffer Godowns By River
BCIC, Dhaka
48
M/s. E. PIHL & Son A/S
Denmark
1999-2000
Customs Clearing and Transportation of  General Cargo for Urban Water & Sanitation from Chittagong Sea Port & Dhaka Airport to 5 District in Bangladesh by Road
 
49
M/s. Bangladesh Chemical Industrial Corporation
Bangladesh
1997
Customs Clearing & Transportation of Urea Fertilizer 50,000 Tons from Chittagong Sea Port to Diferent Buffer Godowns By River
BCIC, Dhaka
50
M/s. Sunnex Limited
Bangladesh
1995-1996
Customs Clearing and Transportation of  Project Cargo H/L (Each 34MT), ODC including General Cargo from Chittagong Sea Port to Feni by Road & River
60 MMSCFD Gas Processing Plant at Feni for BGFCL
51
M/s. Bangladesh Chemical Industrial Corporation
Bangladesh
1997
Customs Clearing & Transportation of Urea Fertilizer 50,000 Tons from Chittagong Sea Port to Diferent Buffer Godowns By River
BCIC, Dhaka
52
M/s. Siemens (Bangladesh) Ltd.
Germany
1996-1997
C & F cum Inland Transportation job of following Projects. Maddhapara Hard Rock Mining Project, 33/66KV Sub-Station Project under contract No. ROCK.100.12 dt.28.7.1995 in Dinajpur
 
53M/s. China Wuhuan Chemical Engineering Corp.
China
1996-97
Customs Clearing and Transportation of  H/L including General Cargo (Project Materials) from Chittagong Sea Port to Kailashtila, Sylhet  by Road & River
Kailashtila LPG Storrage Bottling and Distribution Project of M/s. LPG GAS LTD., Sylhet
54
M/s. Sunnex Limited
Bangladesh
1994
Customs Clearing and Transportation of  various types of Pipes & other General Cargo from Chittagong Sea Port to Habiganj 3 & 4 Gas Project
Gas Processing & Associated Facilities for Habiganj 3 & 4, Sylhet
55
M/s. Sunnex Limited
Bangladesh
1989
Customs Clearing and Transportation of Power Project Cargo H/L (Each 37MT), ODC including General Cargo from Chittagong Sea Port to Ashuganj, Brahmanbaria by Road & River
120 TPH Boiler Project for Zia Fertilizer Company Limited, Ashuganj, Brahmanbaria
56M/s. Sunnex Limited
Bangladesh
1984-1985
Customs Clearing and Transportation of  Project Cargo H/L (Each 54 MT), ODC including General Cargo from Chittagong Sea Port to Ghorashal by Road & River
GTG Project for Palash Urea Fertilizer Factory, Ghorashal
57
M/s. China Huanqiu Chemical Engineering Corp. (HQCEC) 
China
1997
Customs Clearing and Transportation of  H/L including General Cargo (Project Materials) from Chittagong Sea Port to  Sylhet by Road & River
Jalalabad Gas Transmission & Distribution System Ltd., Sylhet
58
 M/s. GS Engineering & Construction
 
South Korea
 1996
 Customs Clearing and Transportation of Siddirgonj 230 KV Substation Materials including H/L from Chittagong Sea Port & Dhaka Airport.

Siddirgonj 230 KV Substation
59
M/s. Hyundai Cement (Bangladesh) Co. Ltd.
Seoul Korea
1996
Customs Clearing and Transportation of  Project Materials, Machineries and Equipments (H/L/ODC) including General Cargo  from Chittagong Sea Port to  Sylhet by Road & River
Hyundai Cement (Bangladesh) Co. Ltd.,
60
M/s. HICO Hyisung Industrial Co. Ltd.
Seoul Korea
1989-1995
Customs Clearing and Transportation of  Project Materials, Machineries (H/L/ODC) including General Cargo  from Chittagong Sea Port, Mongla Sea Port, Benapole Land Port, Dhaka Airport & Kamlapur ICD Station  to  Various Project site
Bangladesh
61M/s. Pertroleum Facilities Engineering
U.K
1995
Customs Clearing and Transportation of  Project Materials, Machineries (H/L/ODC) including General Cargo  from Chittagong Sea Port to  Feni  by Road & River
Feni Gas Treertment Plant A/C. BGFCL, a Company of Petrobangla
62M/s. China National Machinery Import & Export Corporation
China
1992
Customs Clearing  and Transportation of  Power Project Cargo H/L (Each 156 MT), ODC including General Cargo from Chittagong Sea Port to Rangunia by Road & River for 210MW Thermail Power Station
210MW Thermail Power Station, Rangunia, Chittagong
63
M/s. HICO Hyisung Industrial Co. Ltd.
Seoul Korea
1988-1992
Customs Clearing  and Transportation of  Power Project Cargo H/L (72 Nos. 13.5mVA Transformers) ODC including General Cargo from Chittagong Sea Port, Mongla Sea Port to Various substation by Road & River
12,000 Freight Tons Cargo for 42 Sub-Station in Bangladesh
64M/s. Yoyo Engineering Corporation
Japan
1993
Customs Clearing  and Transportation of   Project Cargo (H/L  & ODC) including General Cargo from Chittagong Sea Port, Mongla Sea Port to Ghorasal by Road & River
Ghorashal Urea Fertilizer, Polash, Narsingdi
65
M/s. China National Machinery Import & Export Corporation
China
1994
Customs Clearing  and Transportation of   Project Cargo (H/L  & ODC) including General Cargo from Chittagong Sea Port to Barapukuria, Rangpur  by Road & River
Barapukuria Coal Mine Development, Rangpur
66M/s. Urea Fertilizer Factory Ltd.
Bangladesh
1989
Customs Clearing  and Transportation of   Project Cargo (H/L  & ODC) including General Cargo from Chittagong Sea Port, Mongla Sea Port to Polash, by Road & River
Urea Fertilizer Factory, Polash, Narsingdi
67M/s. Challenger International Services Ltd.
 
1991
Customs Clearing  and Transportation of   Project Cargo (H/L  & ODC) including General Cargo from Mongla Sea Port to Bangladesh Second Gas Development
Bangladesh Second Gas Development
68
M/s. Siemens (Bangladesh) Ltd.
Germany
1991
C & F cum Inland Transportation job of following Projects. Ganga Kapatakha (GK) Project Sub-Station at Bheramara.
 
69
M/s. Bangladesh Power Development Board
Bangladesh
1990
Customs Clearing  and Transportation of  Power Project Cargo (H/L  & ODC) including General Cargo from Mongla Sea Port to BPDB Substation 
Bangladesh Power Development Board
70
M/s. Western India Enterprises Limited
India
1989
Customs Clearing  and Transportation of  Power Project Cargo (H/L & ODC) including General Cargo from Chittagong Sea Port & Mongla Sea Port to Ashuganj  by Road & River
300MW Thermal Power Station, Ashuganj
71M/s. Samwhan Corporation
Seoul Korea
1988
Customs Clearing  and Transportation of  Project Cargo (H/L & ODC above 50Tons) including General Cargo from Chittagong Sea Port & Mongla Sea Port to Bogra  by Road & River
Projeet Consignment, Bogra
72
M/s. Bangladesh Power Development Board
Bangladesh
1988
Customs Clearing  and Transportation of  Project Cargo (H/L  & ODC) including General Cargo from Chittagong Sea Port to Chittagong  by Road
Greater Chittagong Power Development Project (Phase II), Chittagong
73M/s. Corolla Corporation (BD) Limited
Bangladesh
 1988
Customs Clearing  and Transportation of  Power Project Cargo H/L (Each Transformers 43 tons), ODC including General Cargo from Benapole Land Port to Baghabari by Road
132KV Baghabari Sub-Station Project of Power Grid Company of Bangladesh Ltd.
74
M/s. Korea Development Corporation
Seoul Korea
1988
Customs Clearing  and Transportation of  Power Project Cargo H/L & ODC including General Cargo from Chittagong Sea Port, Mongla Sea Port & Benapole Land Port to Ashuganj & Dhaka by Road & River
Ashuganj 300MW Thermal power Station Extension project & Greater Dhaka Power Project Phase Iiof Bangladesh Power Development Board
75
M/s. Bangladesh Power Development Board
Bangladesh
1986
Customs Clearing  and Transportation of  Power Project Cargo H/L(Each 73 Tons) & ODC including General Cargo from Chittagong Sea Port & Mongla Sea Port to Ashuganj by Road & River
Ashuganj 300MW Thermal power Station Extension project
76M/s. Bangladesh Chemical Industrial Corporation
Bangladesh
1985
Customs Clearing  and Transportation of  Power Project Cargo H/L(Each 90 Tons) & ODC including General Cargo from Mongla Sea Port to Khulna by Road & River
Khulna Newsprint Mills Ltd. Khulna
77
M/s. Siemens (Bangladesh) Ltd.
Germany
1984-1988
C & F cum Inland Transportation job of following Projects. West Zone rehabilitation contract dt.18.3.1984 of Bangladesh Power Development Board in Jessore, Jhinaidah & Kushtia.
 
78
M/s. Hyosung Industries Co. Ltd., Dhaka, Bangladesh
South Korea
 
Custom Clearing and Transportation of Transformer with Accessories and other Materials for Greater Khulna Power Distribution Project, Phase-II Implementing Agency Department of Bangladesh Power Development Board.
 
79
M/s. Hyosung Industries Co. Ltd.
South Korea
 
18 Town Power Distribution Project of Bangladesh Power Development Board, Bangladesh.
 
80M/s. Hyosung Industries Co. Ltd.
South Korea
 
7 Transmission Line Project of Bangladesh Power Development Board, Bangladesh.
 
81
M/s. China Henan International Economic Technical Co-Operation Corporation
China
 
14 Town Power Distribution Project of BPDB, Bangladesh.
 
82M/s. China National Machinery & Equipment Import & Export Corporation
China
 
Transportation Work of 210 MW Thermal Power Project Materials, Roujan, Chittagong, Bangladesh.
 
83
M/s. Pacific Construction Co. Ltd. 
South Korea
 
Ashugonj 300MW Thermal Power Station Lot-E.
 
84
M/s. Korea Development Corporation 
South Korea
 
Ashugonj 300MW Thermal Power Station Lot-C.
 
85
M/s. Greater Chittagong Power Distribution Project (BPDB)
Government of Bangladesh
 
Custom Clearing & Forwarding Carrying of Project Materials from Bangladesh Power Development Board, Chittagong.
 
86
M/s. Bangladesh Power Development Board
Government of Bangladesh
 
Custom Clearing & Carrying of the Materials & Equipments of 14 Town Power Distribution Project.
 
87
M/s. Western India Enterprise Ltd.
India
 
Customs Clearing & Transportation Works of 300MW Thermal Power Project Ashiganj.
 
88
M/s. Siemens (Bangladesh) Ltd.
Germany
 
Custom Clearing & transportation of Power Sub Station Materials.
 
89
M/s. LG Engineering Co. Ltd.
South Korea
 
Custom Clearing & Transportation of the Equipment and Materials for Meghnaghat Power Station Associated Transmission line Project Materials for Haripur&Comilla sub Station Project Implementing Agency Department of Power Grid Company of Bangladesh.
 
90
M/s. Crown Power Generation Ltd.
Bangladesh
 
Customs Clearing & Transportation of Heavy Lifts, i.e., Generator Set and Capital Machinery for Power Plant with standard accessories.
 

a concern of